Abstract: This paper presents a particle swarmoptimization (PSO) based algorithm to perform congestionmanagement by properplacement and sizing of one unified power flow controller (UPFC). The proposed approach makes use of the PSOalgorithm to allocate the near-optimal GenCos as well as the optimal location and size of UPFC whereas the Newton–Raphson solution minimizes the mismatch of the power flow equations. Simulation results (without/with the line flowconstraints, before and after compensation) are used to analyses the impact of UPFC on the congestion levels of the5-bus test system.
[1] Hajforoosh. S.,Nabavi.S.M.H., and Masoum.M.A.S., "Coordinated aggregated-based particle swarm optimisation algorithm for congestion management in restructured power market by placement and sizing of unified power flow controller" IET Sci. Meas. Technol., Vol. 6, No. 4, pp. 267–278, 2012.
[2] Verma, K.S., Singh, S.N. and Gupta, H.O.: "Location of unified power flow controller for congestion management‟, Electr. Power Syst. Res., Vol. 58, No. 2, pp. 89–96, 2001. [3] Bruno, S., and LaScala, M.: "Unified power flow controllers for security constrained transmission management‟, IEEE Trans. Power Syst., Vol. 19, No. 1, pp. 418–426, 2004
[4] Sarvi, M., Sedighizadeh, M., and Qarebaghi, J.: "Optimal location and parameters setting of UPFC based on particle swarm optimization for increasing loadability‟, Int. Rev. Electr. Eng. (IREE), Vol. 5, No 5, Part B, pp. 2234–2240, 2010.
[5] Yousefi-Talouki, A., Gholamian, S., Hosseini, M., andValiollahi, S.:"Optimal power flow with unified power flow controller using artificial Bee colony algorithm‟, Int. Rev. Electr. Eng. (IREE), Vol. 5, No. 6, pp. 2773–2778, 2001
. [6] Jahani, R., ChahkandiNejad, H., ShafighiMalekshah, A., and Shayanfar,H.A.: "A new advanced heuristic method for optimal placement of unified power flow controllers in electrical power systems‟, Int. Rev.Electr. Eng. (IREE), Vol. 5, No 6, pp. 2786–2794, 2001.
[7] LashkarAra, A., Aghaei, J., and Shabani, M.: "Introducing a fuzzy inter active multi-objective approach to optimal location of UPFC‟, Int. Rev. Electr. Eng. (IREE), Vol. 5, No. 6, pp. 2896–2906, 2010
[8] Nor RulHasma Abdullah and Ismail Musirin and Muhammad Murtadha Othman."Transmission Loss Minimization and UPFC Installation Cost using Evolutionary Computation for Improvement of Voltage Stability‟International Middle East Power Systems Conference,2010
[9] Singh, S.N., and David, A.K.: "Optimal location of FACTS devices for congestion management‟, Elect. Power Syst. Res., Vol. 58, No. 2, pp. 71–79, 2001. [10] Mithulananthan, N.,andAcharya, N.: "A proposal for investment recovery of FACTS devices in deregulated electricity markets‟, Electr. Power Syst. Res., Vol. 6, pp. 695–703, 2007.